Contactor with start and stop

Level 5 of 33 in the Electrical lab: a free panel wiring exercise at Intermediate level. Wire a contactor coil with a START (normally open), a STOP (normally closed) and its own hold-in contact, so a short press latches it on. Add a pilot lamp.

IntermediateNot started

Goal

A contactor is a switch worked by a coil.

What you do

  1. Lock out the board at the isolator Q1: switch OFF, apply your lock and your tag.
  2. Prove it dead with the meter or the voltage tester, live-dead-live: prove the instrument on the proving unit, check the board reads 0 V, prove it again.
  3. Wire the 10 conductors of the schedule. STOP is normally closed (11-12) and sits first in the line, so a broken wire stops the circuit.
  4. Restore power: tick the checklist, remove your tag and lock, switch Q1 ON.
  5. Press START and let go: K1 stays in and the lamp stays on. Press STOP: both drop out. Then run the FAT.

Done when

The factory acceptance test is marked against the panel you built.

  • 10 conductors in the wiring schedule
  • 3 dead checks before you touch the panel

Skills

Control wiring at Intermediate level.

Before you start

Level 4, A socket on an RCD, comes first. Do it first if the ideas are new to you.

Free, in your browser, nothing to install. Your work is saved on this device. Updated 1 Nov 2026.

33 levels

Levels in the Electrical lab

Lock out, wire, test and fault-find a control panel, then prove it with a factory acceptance test.

Wiring basics

Levels 1 to 10
  1. Start Meet the bench and your meter
  2. Start One lamp, one switch
  3. Start Two-way switching: a stair light
  4. Start A socket on an RCD
  5. Start Contactor with start and stop
  6. Start Direct-on-line motor starter
  7. Start Forward and reverse with an interlock
  8. Start Star-delta with a timer
  9. Start Timers and relays
  10. Start Find the faults

Electrical drawings

Levels 11 to 23
  1. Start Symbols you will meet
  2. Start How a drawing set is organised
  3. Start Read a power circuit
  4. Start Read a control circuit
  5. Start Read a PLC input and output drawing
  6. Start Terminal plans and cable lists
  7. Start Use the drawing to find a fault
  8. Start Draw your first circuit
  9. Start Draw a direct-on-line starter
  10. Start Draw a forward and reverse starter
  11. Start Draw the PLC input and output sheet
  12. Start Draw the panel layout and parts list
  13. Start Build what you drew

Control panels

Levels 24 to 33
  1. Start Commission the transfer-pump starter
  2. Start Fault-find the outfeed conveyor starter
  3. Start Commission the star-delta fan starter
  4. Start Commission the reversing conveyor starter
  5. Start Commission the overhead tank pump (Hand/Off/Auto)
  6. Start Commission the sorting station sensors
  7. Start Commission the variable-speed infeed conveyor drive
  8. Start Commission the 4-20 mA level loop
  9. Start Commission the pneumatic pusher station
  10. Start Commission the packing cell (capstone)

Part of the Electrical lab

Lock out, wire, test and fault-find a control panel, then prove it with a factory acceptance test.

Feeds these internships (training, not employment): Control Panel Design and Wiring, Commissioning and Maintenance, Instrumentation and Process Control.

About the Electrical lab

Ready for Contactor with start and stop?

Free, in your browser, with nothing to install.