Skip to content

The lab is in beta. Found something wrong?Beta · Found something wrong?

AI Data Centre · Level 1 of 8

Safety walk and hall tour

Level 1 of 8 in the AI Data Centre: a free data centre exercise at Foundation level. Walk an AI data hall for the first time. Name the aisles, find the emergency controls and choose the protective equipment.

Start this level

Free · no download. Your work is saved on this device. Updated 18 Oct 2026.

3D view of the Safety walk and hall tour level in the AI Data Centre
Safety walk and hall tour

The brief

Client
Northfield Compute
Site
Hall 2, Greenmoor campus
Work order
WO-DC-101
Task code
DC-01
Difficulty
Foundation
Type of work
Safety

Walk an AI data hall for the first time. Name the aisles, find the emergency controls and choose the protective equipment.

Skills you practise

  • Hot and cold aisles
  • Emergency power off and fire panel
  • Hall safety

What the test checks

The acceptance test marks the skills this level practises.

  • Hot and cold aisles
  • Emergency power off and fire panel
  • Hall safety

In this lab

  • Rack and cable GPU servers
  • Power budgets and cooling
  • GPU jobs and a DCIM view

Levels in the AI Data Centre

Next: Rack and cable a GPU server

  1. Safety walk and hall tour
  2. Rack and cable a GPU server
  3. Rack power budget
  4. Cooling hot spot
  5. PUE from a month of meters
  6. Replace a failed part from a ticket
  7. Training job slowdown
  8. Power event drill

Part of the AI Data Centre

Walk an AI data hall, rack and cable a GPU server, and size its power and cooling.

About the AI Data Centre

Feeds these internships: AI and Machine Learning, Data Science and Analytics, AI Agents and Automation, Electrical Design.