AI Data Centre · Level 2 of 8
Rack and cable a GPU server
Level 2 of 8 in the AI Data Centre: a free data centre exercise at Foundation level. Install a new 8-GPU AI server: right place in the rack, on rails, power from both feeds, fabric and management cables, labels and blanking panels.
Free · no download. Your work is saved on this device. Updated 18 Oct 2026.

The brief
- Client
- Kestrel Cloud Labs
- Site
- Hall 1, Ashbourne site
- Work order
- WO-DC-102
- Task code
- DC-02
- Difficulty
- Foundation
- Type of work
- Installation
Install a new 8-GPU AI server: right place in the rack, on rails, power from both feeds, fabric and management cables, labels and blanking panels.
Skills you practise
- Rack elevation
- A and B power
- Spine-leaf cabling
- Labelling
What the test checks
The acceptance test marks the skills this level practises.
- Rack elevation
- A and B power
- Spine-leaf cabling
- Labelling
In this lab
- Rack and cable GPU servers
- Power budgets and cooling
- GPU jobs and a DCIM view
Levels in the AI Data Centre
Part of the AI Data Centre
Walk an AI data hall, rack and cable a GPU server, and size its power and cooling.
Feeds these internships: AI and Machine Learning, Data Science and Analytics, AI Agents and Automation, Electrical Design.