Skip to content

The lab is in beta. Found something wrong?Beta ยท Found something wrong?

The factory acceptance test in the Panel Lab

The factory acceptance test runs on a finished panel and all six checks pass.

Try this in the lab: Commission the transfer-pump starterAbout the Panel Lab

Transcript

The test starts. The checks run one after another and each passes. The result reads 6 of 6.

More videos from the Panel Lab

  • Wire a real control panelWatch
  • Isolate, lock and tagWatch
  • Prove dead: live, dead, liveWatch
  • Wire to the scheduleWatch

All videos