Panel Lab · Level 1 of 10
Commission the transfer-pump starter
Level 1 of 10 in the Panel Lab: a free panel wiring exercise at Foundation level. Lock out, prove dead, wire the control circuit to the PLC, restore power and run the pump. A 415 V DOL starter with a 24 V PLC, built the way industrial panels are.
Free · no download. Your work is saved on this device. Updated 18 Oct 2026.

The brief
- Work order
- WO-PS-101
- Job
- Commission the P-101 transfer-pump starter
- Difficulty
- Foundation
- Type of work
- Commissioning
- Detail
- 19 wires, lockout, meter checks and a PLC program
The starter panel for transfer pump P-101 has arrived from the panel shop with the power circuit and the 24 V supply wired. The control wiring to the PLC is yours.
What you do
- Lock out the panel at the main isolator Q1: switch OFF, apply your lock and your tag.
- Prove it dead with the meter, live-dead-live: prove the meter on the live incoming terminals, check every conductor on the load side reads 0 V, prove the meter again.
- Wire the 19 conductors of the wiring schedule. One conductor per terminal: X2 has spare bridged terminals for +24 V (1–6) and 0 V (7–12).
- Read the supplied PLC program. You may improve it, but the tag addresses must match your wiring.
- Restore power: tick the checklist, remove your tag and lock, switch Q1 ON, put the PLC in RUN.
- Test: START runs the pump and fills the day tank, STOP and the E-STOP stop it, an overload trip stops it and lights TRIP, and nothing restarts by itself. Then run the FAT.
What the test checks
The factory acceptance test is marked against the panel you built. The level sets out:
- 19 conductors in the wiring schedule
- 6 dead checks before you touch the panel
In this lab
- Lock out and prove dead, live-dead-live
- Wire the backplate from the schematic
- Meter, tester, clamp and insulation tester
Levels in the Panel Lab
Next: Fault-find the outfeed conveyor starter
- Commission the transfer-pump starter
- Fault-find the outfeed conveyor starter
- Commission the star-delta fan starter
- Commission the reversing conveyor starter
- Commission the overhead tank pump (Hand/Off/Auto)
- Commission the sorting station sensors
- Commission the variable-speed infeed conveyor drive
- Commission the 4-20 mA level loop
- Commission the pneumatic pusher station
- Commission the packing cell (capstone)
Part of the Panel Lab
Lock out, wire, test and fault-find a control panel, then prove it with a factory acceptance test.
Feeds these internships: Control Panel Design and Wiring, Commissioning and Maintenance, Instrumentation and Process Control.