Correct the power factor

Level 7 of 8 in the Substation and MCC lab: a free substation and MCC exercise at Advanced level. Size a capacitor bank to take a plant to 0.95, choose its steps for full and light load, and decide whether it needs detuning.

Start this level

Free · no download. Your work is saved on this device. Updated 18 Oct 2026.

3D view of the Correct the power factor level in the Substation and MCC lab
Correct the power factor

The brief

Client
Ashgrove Plastics
Site
Moulding hall, LV board 1
Work order
WO-MCC-107
Task code
MCC-07
Difficulty
Advanced
Type of work
Design

Size a capacitor bank to take a plant to 0.95, choose its steps for full and light load, and decide whether it needs detuning.

Skills you practise

  • Power factor
  • Capacitor sizing
  • Step selection
  • Harmonics and detuning

What the test checks

The acceptance test marks the skills this level practises.

  • Power factor
  • Capacitor sizing
  • Step selection
  • Harmonics and detuning

In this lab

  • Safe isolation: lock, tag, prove, test, earth
  • Cables, breakers, relays and fault levels
  • A 3D switchroom and transformer bay

Levels in the Substation and MCC lab

Previous: Fault level and breaker checkNext: Find a fault in the MCC

  1. Read the single-line diagram
  2. Safe isolation of an MCC bucket
  3. Size a motor circuit
  4. Commission a star-delta starter
  5. Grade the incomer relay
  6. Fault level and breaker check
  7. Correct the power factor
  8. Find a fault in the MCC

Part of the Substation and MCC lab

Walk a small substation, isolate a motor bucket safely, grade a relay and fault-find a motor control centre.

About the Substation and MCC lab

Feeds these internships: Control Panel Design and Wiring, Commissioning and Maintenance, Electrical Design.